The Burj DubaiAs I write this, the Burj Dubai has now reached her 146th level and still to go higher. She now also stands as the world's tallest skyscraper at 536.1 meters, surpassing the Taipei 101 which stands at 508 meters. The other tall buildings are the Petronas Towers in Malaysia (452 meters), the Sears Tower in the USA (442 meters), and the Jin Mao Tower in China (420.5 meters).
Emaar Properties is the developer to the Burj Dubai District which includes among others this magnificent structure. You can check out their websites http://www.emaar.com/ and http://www.burjdubai.com/.
Samsung Corporation is the main contractor.
Mechanical System
1. Chilled Water Cooling System: approximately 10,000 tons of cooling per hour at peak cooling time, which is equivalent to the capacity provided by melting 10,000 tons of ice in one day. (10,000 tons is equivalent to 22.4 million lbs or 10.2 kgs).
2. Water Supply System: average of 946,000 liters (250,000 gallons) per day.
3. Electrical System: estimated at 36 MVA at peak electricity demand, which is equivalent to 360,000 100-W light bulbs operating at the same time.

4. Firemen /Service Elevator: will have a capacity of 5500 kgs and will be the world's tallest service elevator.
Structure
1. Seismic design: condition assumed similar to that of the Uniform Building Code zone 2A.
2. Concrete: 230,000 cubic meters of concrete and 31,400 metric tons of rebars would have been utilized (excluding the foundations). The concrete would be approximately equivalent to the weight of 100,000 elephants, while the rebars would cover a quarter of the way around the world if laid end to end.
3. Curtain Wall: consisting of 83,600 sq. meters of glass and 27,900 sq. meters of metal, which combined is equivalent to 17 soccer fields or 25 American football fields.